


It can be conclude that there is no relationship between road distress and heavy vehicle (lorry, bus and trailer) at the peak hours of 5.00pm to 6.00pm. Where the percentage for lorry is 3.6%, the percentage of bus is 0.4% and the percentage of trailer that using that road is 0.38%. From the result, it show that there are small percentage of lorries and busses that using this road. The objectives of this study are to get detail information related to the type, severity level of existing distress collected by doing a survey and relationship between traffic volume and pavement distress. This study practice about to the identifying flexible pavement distress along the jalan Permatang Pauh, Pulau Pinang.
